Power grid checker

Get instant insight into power grid space

Do you have plans for sustainability? Then it may be necessary to increase the power connection. First check with the grid operator whether there is enough room on the grid. This can be done on the website of the grid operator by entering your address. This way you know where you stand and what you can do.

Key text: Changes in requests for power connections per 1 July 2026

The power grid in our region is becoming increasingly full. As of July 1, 2026, new rules will therefore apply for allocating space on the power grid. It may mean that you have to wait longer for a new connection or an aggravation of a current connection. Want more information? Then take a look at The website of Enexis(external link)(external link).

Questions

What is an aggravation?

In an attenuation, a grid operator adjusts the power connection so that it can supply more power. You can then use more power at the same time. You can also use appliances with more power, such as a charging station for an electric car or a large air conditioner. A licensed installer can advise you to increase the capacity of the connection when, for example:

  • put (additional) solar panels on your roof;
  • going electric cooking;
  • have a heat pump installed.
Can I also become more sustainable without ballasting?

Yes,check the tips on the website of Verbeterjehuis.(external link) There are also measures where you do not need to increase the load.